For those of you that may be confused on how to assemble the MAV -

The main stage is not truly six-way symmetrical. If you wish to attach parts
radially, you'll need to use 3-way symmetry twice.

Use the stock separators if you want a slimmer profile than the decouplers.

Be sure to enable crossfeed on the  decouplers/separators, otherwise the base's
engines will not be able to ignite, and you'd better hope you have a HUGE parachute.

The pictured craft is assembled like this:

Shielded Docking Port or 1.25m Parachute
MK1-2 Pod
MAV Interstage
	4 0.625 engines
Separator
MAV Main Stage
	6 LV-T30 Engines
	Decoupler (Center, cross-feed enabled)
Base
	4 Landing Legs
	4 Vector Engines
	Mobility Enhancer Ladder under airlock.
